The data for solar panel output for July has now been loaded to the website.
http://solar-panels-review.321web.co.uk/yearly-solar-panel-stats.php
Despite the poor weather July has not been too bad for electricity generation from our solar panels beating both the SAP and PV-GIS numbers.
The final electricity generated for July 2012 was 393kWh compared with a PV-GIS estimate of 351kWh.
In July there were 30 days with over 5kWh generation and 23 days over 10kWh but only the 1 day over 20kWh.
The depressing thought is that from now on it is all downhill as every month will get lower generation going into autumn and winter....
A blog all about the 3kWp PV Solar panels installed in Nov 2011 in Kent UK by Solar Advanced Systems. Follow the ongoing performance and how much solar power we generate over the next few months as well as the problems and solutions we encounter along the way such as solar panels electric meter going backwards. We are registered with British Gas for our FIT payments and our roof is SSW facing. We have 14 x Sungrid 215W solar panels and Sunny Boy 3000HF inverter.
No comments:
Post a Comment