The most annoying part was that it appears the inverter developed the error on the day before we left so it could have been possible to resolve it before we went away and have not lost the generation for those days in August.
The error on the Sunny Boy 3000HF inverter was Error 8 - Waiting for Grid Voltage, Check Fuse, Contact Installer. Having tried the usual turn off, turn on and resetting fuses without success we called out the installation company to investigate the problem.
Almost as frustrating as losing the generated electricity was that the solution was very simple - Turn off, leave off and turn back on again after 10 minutes. Obviously the short reset I had tried was not sufficient to restart or reinitialise the Sunny Boy inverter to reset the error. In addtion to the £100 of lost generation I was now down another £80 with the cost of the callout by the installers!