At the mid point of march the solar power generated is looking as poor as that for February and January and way below 2012. However on closer inspection the generation to date of 90kwh for march is identical to last year so fingers crossed that the remainder of the month matches last year and hits the 300kwh target.
A blog all about the 3kWp PV Solar panels installed in Nov 2011 in Kent UK by Solar Advanced Systems. Follow the ongoing performance and how much solar power we generate over the next few months as well as the problems and solutions we encounter along the way such as solar panels electric meter going backwards. We are registered with British Gas for our FIT payments and our roof is SSW facing. We have 14 x Sungrid 215W solar panels and Sunny Boy 3000HF inverter.
Saturday 16 March 2013
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment